How long would it take me to insulate my loft?

How long would it take me to insulate my loft?

Allow about half a day once you have bought the insulation. Remember – you will need one layer of 100mm between your roof joists if you don’t have any insulation, then a second layer of 170mm on top (cross layered) to comply with current building regulations. Measure the area of your loft and look at the packaging label for the area contained in a roll.

Posted in: Loft Insulation